B. Dexter Lefavour PE

solid waste

Selected Solid Waste Experience

  • Design and permitting for two recycling drop-off centers serving suburban communities
     
  • Construction of a lined landfill with leachate collection and pumping facilities for ash from a resource recovery plant
     
  • Landfill siting for a lined landfill to serve 33 towns, 120 tpd, including initial screening of 33 towns, public presentation of siting process, approximately 120 potential sites reviewed, 14 sites considered in greater detail for risk of ground water and surface water contamination
     
  • Review of two operating landfills for potential use and/or purchase as a district-owned landfill
     
  • Reviewed proposals from private landfills to provide interim lined landfill capacity to a solid waste district
     
  • Designed the closure of more than a dozen existing landfills
     
  • Designed relocation of 40,000 CY landfill into lined and covered cell
     
  • Responsible for hydrogeologic assessment of 14 landfills in a statewide landfill assessment program, scope of study included: field survey and landfill recon, remote sensing, geophysical surveys, installation of monitoring wells, and reporting
     
  • Performed annual inspections on operating landfills in accordance with their operating licenses
     
  • Ground monitoring and sampling at many private and municipal landfills
     
  • Site selection for a materials recovery facility and a transfer station for an 11 town solid waste district
     
  • Waste inventory, cost analysis and preliminary design for a windrow organic waste composting facility to receive sludge and source separated food wastes
     
  • Process selection and preliminary design of a food waste and animal manure composting facility for the University of Vermont
       

Recycling Centers and Materials Recovery Facilities Design

Chittenden Solid Waste District
South Burlington Recycling Drop-Off Center

Chittenden Solid Waste District
Essex Recycling Drop-Off Center

Chittenden Solid Waste District
Materials Recovery Facility, Williston, VT

Central Vermont Solid Waste Management District
Wilson Recycling Depot, Barre VT
 

Lined Landfill and Leachate Collection

Central Vermont Solid Waste Management District
Preliminary Design, CV Landfill, East Montpelier, VT

Central Vermont Solid Waste Management District
Preliminary Design, Palisades Landfill, Moretown, VT

Westchester County DPW, Peekskill, NY
Sprout Brook Residual Management Facility, Design and Construction Services

Town of New London, NH
Landfill Closure Design, (relocation into a lined cell)
 

Landfill Closure

Mr. Lefavour either completed the actual design of served as Project Manager for design of each landfill indicated below. Projects for which he provided engineering services during construction are indicated by an asterisk (*).

  Fair Haven, VT Wells, VT
  West Rutland, VT Tunbridge, VT*
  Washington, VT* New London, NH
  Tamworth, NH Conway, NH
  Barnard, VT* Highgate, VT
  Hartford, VT GE Rutland, VT*
  Kennebunk, ME Saco, ME
  Belmont, NH Dudley, MA*
  Bethel/Royalton, VT  
 
 
B. Dexter Lefavour PE
info@BetterEffluent.com
fax: 802-223-6272
42 Dolan Road
Middlesex, Vt 05602
voice: 802-224-9060
  ©2005 Lefavour P.C.